复合射孔压力加载下铜柱测压计测试实验和数值分析

崔春生 马铁华 祖静

崔春生, 马铁华, 祖静. 复合射孔压力加载下铜柱测压计测试实验和数值分析[J]. 爆炸与冲击, 2012, 32(4): 439-444. doi: 10.11883/1001-1455(2012)04-0439-06
引用本文: 崔春生, 马铁华, 祖静. 复合射孔压力加载下铜柱测压计测试实验和数值分析[J]. 爆炸与冲击, 2012, 32(4): 439-444. doi: 10.11883/1001-1455(2012)04-0439-06
CUI Chun-sheng, MA Tie-hua, ZU Jing. Experimentandnumericalanalysisofthetestofcoppercylinderpressuregaugeundercombinedperforationpressure[J]. Explosion And Shock Waves, 2012, 32(4): 439-444. doi: 10.11883/1001-1455(2012)04-0439-06
Citation: CUI Chun-sheng, MA Tie-hua, ZU Jing. Experimentandnumericalanalysisofthetestofcoppercylinder pressuregaugeundercombinedperforationpressure[J]. Explosion And Shock Waves, 2012, 32(4): 439-444. doi: 10.11883/1001-1455(2012)04-0439-06

复合射孔压力加载下铜柱测压计测试实验和数值分析

doi: 10.11883/1001-1455(2012)04-0439-06
详细信息
    通讯作者:

    崔春生

Experimentandnumericalanalysisofthetestofcoppercylinder pressuregaugeundercombinedperforationpressure

More Information
    Corresponding author: CUI Chun-sheng
  • 摘要: 进行基于铜柱测压和实测压力时间曲线的石油井射孔压裂实验,建立铜柱测压计的数学模型,并 采用交互式计算方法得出其作用过程的解析解。分析结果表明,井下射孔压裂过程中,压力上升沿很陡,活塞 在外部压力达到峰值时,速度很大,会继续压缩铜柱直到速度为零。活塞的运动可以分为加速和减速撞击2 个过程。活塞的最大速度决定了铜柱测压计最终测试值,且与速度成正比。射孔脉冲压力加载过程中铜柱测 压计的误差取决于压力上升时间、脉冲宽度、峰值压力等影响因素。火炮膛压加载下铜柱测压计误差较小。
  • 加载中
计量
  • 文章访问数:  2354
  • HTML全文浏览量:  65
  • PDF下载量:  422
  • 被引次数: 0